We convert into…

Power

water

fuel

ISP’s are

Emissions Zero

Residue Zero

Startup Power Nil

Fuel Our own LT UltraGAStm

Area 1/10th of conventional plants

Cost to you Zero

In case of Solid waste

In case of Solid waste

  • From 100 mtpd of unsegregated solid waste we generate 35 MW of power
  • Segregation is not required
  • Any amount of moisture is acceptable
  • The calorific value has no concern in LT plant
  • No landfills required at all
  • Zero emission
  • Zero residue
  • We follow BOOM model (BUILD, OWN, OPERATE, MAINTAIN)
  • All our plants are monitored 24*7*365 by our LT satellite
  • Installation and Commercial operation requires small time frame of 9 to 18 months
  • Drinking Water & Fuel are our by product

Solid Waste : C & T

In case of Liquid Waste

In case of Liquid Waste

  • From 01 MLD of liquid waste we generate 10 MW of power along with 9.5 million of drinking water & fuel
  • Our Plants does Self cleaning and Self maintaining
  • Sludge processing
  • No landfills required at all
  • Zero emission
  • Zero residue
  • We follow BOOM model (BUILD, OWN, OPERATE, MAINTAIN)
  • All our plants are monitored 24*7*365 by our LT satellite
  • Installation and Commercial operation requires small time frame of 9 to 18 months
  • Drinking Water & Fuel are our by product

Thermal plant waste to energy